Maintenance of laboratory instrumentation moisture analyzer:
Instrument installation and places:
1, the instrument shall not be installed in a corrosive gas indoor part of the instrument circuit corrosion, shortening the instrument life.
2, less than 5 degrees or higher than 40 degrees, at room temperature.
3, shall be installed in place of sunlight and humidity.
4, shall be installed in the unstable power supply, it is recommended that the use of electronic regulator.
Second, the maintenance of the electrodes:
Measuring electrode contamination, acetone or ethanol wipe, still can not decontamination, available alcohol lamp burning the platinum golden goal end.
2, the electrolytic electrode is contaminated, acetone or ethanol into the cathode chamber, repeatedly shaking, in order to remove the dirt inside.
Third, the electrolytic cell of drying:
Decomposition, into the electrolytic cell the drying five hours in an oven at about 50 degrees, wait until the natural cooling after adding reagent.